Page: Equipment Installation & Operation

Graniteville Equipment Installation & Operation

In September 2014, we began installation of Lines 1 and 2 of the Adelmann closed-loop recycling system. By January 2015, Lines 1 and 2 began full operation.  View this slide show to view the installation and full operation in process.